Share this page
  • Share this page on Twitter Share this page on Facebook Share this page on Digg Share this page on Del.icio.us Read the Inside Microsoft Research blog
  • E-mail this page Print this page
  • RSS feeds
Home > Projects > Hardware performance analysis using the Critical Path
Hardware performance analysis using the Critical Path

Theory and practice for performance analysis of concurrent hardware.

Overview

The Dynamic Critical Path is the longest chain of events in the timed-graph. (The timed graph models the time-evolution of a circuit.) Analyzing the critical path can offer important insights about the bottlenecks of a circuit. We have built automatic tools which extract, summarize, analyze the critical path, and use it to optimize circuits.

Project Members

  • Girish Venkataramani, intern 2005
  • Hari Kannan, intern 2008
  • Mihai Budiu

Publications